With the fuel system overhaul behind us, we turned our attention to getting our Macwester Malin ready for crane-in. As you can see from the shot above, she’s got a fresh coat of antifoul paint coupled with a new boot top. The main sail and genoa are back on, and the mizzen followed later.

You probably can’t spot the replacement sprayhood windscreen that we had replaced professionally over the winter. To be honest, we’re a little disappointed as the quality of the replacement material isn’t as good as the Dutch original. However, the windscreen needed replaced and the new one is an improvement, despite falling short of our expectations.

My little helpers kindly re-varnished and painted the dinghy (above left). Then with one week to go, it was time for my least favourite pre-season task, which is as much fun as wading through mud …mainly because it is wading through mud. As the tide receded I reluctantly dragged on my waders and trudged out to our mooring. It was heavy going, as the large and heavy tools and the large and heavy chain relentlessly sank into the energy-sapping putty. All in all it took me two and a half hours to make some alterations to the mooring ground chains including swapping out a couple of shackles, and re-installing the Hippo buoy. On the plus side I avoided face-planting the brown stuff.

Back onboard, I replaced the engine anode, and then proceeded to bleed the fuel system. I had studied the manual and was struggling to understand where the air actually escaped from the system. My chum from Joint Venture offered to help and he realised that our Lombardini diesel has a self-bleeding system, so all that’s required is to prime the fuel …and the air escapes back into the port fuel tank all by itself.

Unsurprisingly, the engine took a few attempts to start due to the fuel system overhaul, however everything was fine when it was up and running. I let the engine warm up a little before shutting it back down again.

We checked the gearbox oil which didn’t need changing. I then set about draining the engine oil. As you can see above, our Lombardini has a dedicated pump on the starboard side of the engine to empty out the oil. I cut a small cross-hatch in the side of a used water bottle and pushed the bottle on to the oil outlet before pumping the oil out. Easy.

I refilled the engine with fresh oil, and then tightened the fan belt which was a tad on the loose side. After a few more checks, I turned on the ignition and the engine burst into life first time.

That’s it. Our Macwester Malin is ready to get her bottom wet. With just four sleeps to go, crane-in and season 2017 is up next!